Premise

Kestrel Platform fictional company

Loading the company brain…

Drag to turn the brain · point at a cell to trace it

Search finds documents.
Premise finds consequences.

Change one fact. See which engineering promises break, who needs to review, and which fix holds up.

Live from FalkorDB

8/9
Guarantees healthy
1
Promises expiring soonAttestations due within 180 days: A_STABLE_EVENT_ID, 1 Mar 2027
1
Orphaned decisionsADR-012 · no active owner
Fig. 1. 12 tracked facts feed 9 assumptions, which hold up 9 guarantees. Drawn live from FalkorDB.

The decision network

The same nerves as the brain above, laid flat. Point at a cell to trace everything it touches; fire a change and watch the signal travel from the fact to every guarantee it breaks.

Try a proposed change. Nothing is stored or posted.

Choose a change to trace its consequences.

  • Holds on its full prerequisite set
  • Unknown: evidence missing or expired
  • Broken by the proposed change
Today

Forecasts attestation expiry on the current graph. It changes the guarantee view; it does not reconstruct old revisions.

What still holds?

Ordered by graph PageRank

Recent PR assessments

Pull requestVerdictRevision
#9004 Local demo S12: bundled fixture assessmentpublic-dem NEEDS_REVIEW 1
#9003 Local demo S2: bundled fixture assessmentpublic-dem CLEAR_WITHIN_SCOPE 1
#9002 Local demo S1_FIXED: bundled fixture assessmentpublic-dem CLEAR_WITHIN_SCOPE 1
#9001 Local demo S1: bundled fixture assessmentpublic-dem BLOCKED 1

Accountability gaps

Accepted decisions with no active accountable author or approver

Ingestion warnings (2)